MW scale batteries to accelerate time to power

Electric Era builds and operates a battery energy storage and software platform for above-the-grid power, flexible interconnection, and power quality.
Contact us
Aerial view of a large Edge data center building surrounded by parking lots and greenery.
[Case Study] Ensuring grid compliance at Plaid Pantry: Voltage support for high power transient loads
OUR EXPERTISE

Software-defined power infrastructure

Legacy energy storage software gives operators dashboards and alerts. Electric Era uses an autonomy-first platform architecture that makes and executes smarter decisions faster. The result is up to 99.99% availability, better economics, and a platform that scales.

Solution consultation

  • Problem identification
  • Review of existing data/models
  • Recommended system architecture (SW+HW)
  • System scoping and economics

Asset optimization

  • Execution of application(s)
  • Predictive load forecasting
  • Utility tariff optimization
  • Participation in utility programs or grid services

Operations & maintenance

  • Up to 99.99% availability guaranteed
  • Autonomous monitoring, detection, and resolution via FDIR
  • Escalation to 24/7 NOC with OTA
  • Field dispatch, if necessary

Design, engineering & hardware

  • CD30 to stamped CD100
  • Software configuration by application
  • Utility T&D modeling, if applicable
  • Hardware spec and procurement (battery, distribution, site controller)

Utility coordination & permitting

  • Secure utility agreements
  • Secure permits to build
  • Project management and schedule
  • BESS subject matter expertise

Construction & commissioning

  • Site preparation
  • Project installation
  • Site energization and commissioning
  • Utility witness testing, if applicable
APPLICATIONS

Get megawatts of power faster

Electric Era’s integrated solution drives economic value and accelerates time to power — both underpinned by the ability to mitigate risk by delivering up to 99.99% power availability.

Above-Grid Power

Most operators treat oversubscription as a simple statistics problem. CoPower operates above the physical grid limit (without tripping NEC-mandated circuit protections) increasing load capacity and utilization.

Read more

Flexible Interconnection

As more governing bodies roll out regulations around large load interconnections, data centers need flexible solutions to accelerate time to power.  In ERCOT, for example, as a curtailable load resource (CLR), the data center’s full load doesn’t have to be curtailed; you can use appropriately-sized BESS to respond, when called by ERCOT, by discharging during specific windows.

Electric Era's software-defined approach means more flexibility and extensibility to rapidly meet new and changing flexible interconnection programs and accelerate time to power.

Read more

Up to 99.99% Power Availability

Legacy BESS solutions deliver supervisory systems to empower human observability and control with limited availability. Electric Era offers up to 99.99% guaranteed availability by deploying redundant capacity and delivering an autonomy-first platform (operations as a software problem) that is more scalable, more reliable, and makes smarter decisions faster.

Read more

Intelligent infrastructure for the Electric Era

EV fast charging
As EV fast charging matures and 8, 12, 20+ high power stalls become common, operators will need MWs of power from an increasingly constrained grid. CoPower accelerates deployment speed with high availability power.
AV depots
Autonomous vehicle (AV) fleet charging depots require megawatts of power in prime, urban real estate as fast as possible. CoPower unlocks previously unavailable parcels, giving AV fleet operators a differentiated advantage.
Edge data centers
 Capacity "coming soon" isn't enough. CoPower lets you offer more compute density on the same grid connection, today. 99.99%+ power availability and sub-second response gives you an SLA story that legacy solutions can't match.

Seamless platform integration

FlexPower's Energy Intelligence Platform works with existing DCIM, UPS, and BMS to minimize deployment friction.

Robust network operations

From space-grade FDIR to 24/7 remote NOC, to continuous software-driven improvements, FlexPower increases resilience and just gets better over time.

End-to-end vertical integration

Electric Era deploys solutions reliably and efficiently—with experience deploying dynamic power capacity and management across hundreds of EV fast charging ports nationwide.

CoPower vs. Baseload Energy

Grid

Generators

Instantaneous power (sub-second)

-

Required min. power output (% capacity)

0%

0%

40%

Load flexibility

High

High

Low

Voltage/frequency flicker stabilization

-

Partial

Power availability

99.9%+

Up to 99.99%+

90-95%

Footprint (ft²/MW)

Minimal

~350

~9000

Footprint (MW/acre)

N/A

125 MW

5 MW

Lead time (years)

Up to 7

< 1.5

Up to 5

Ideal use case

Baseload

Buffer

Baseload

CoPower vs. Legacy BESS

Legacy BESS

Model

Vertically integrated hardware + software; turnkey EPC + long-term service

OEM hardware + optional EMS; EPC and servicing add-ons

Scale range

Modular, MW scale

Modular, MW scale

Power availability

Up to 99.99%
(contractual guarantee)

95-99%

Fault resolution

Autonomous FDIR → OTA → Field dispatch

Monitor and alert, human fix

Power control response time

<3 ms

2-150 ms

Oversubscription / uprate

Uprates sellable compute 15–40% above grid limit

Not applicable

Discharge duration

1-4 hr

1-4 hr

Ready to begin your Electric Era?

Get started and accelerate your time to market with CoPower.
Contact us
close or delete icon